Name of the Equipment | Hydrothermal Reactor_Fume Hood 2 |
Category | clean |
Operator | |
System Owner | |
Short Name | |
Make/ Model | / |
Critical Tool | No |
Serial Number | |
FootPrint | |
InstallationDate | |
Equipment Type | Deposition, Growth and Annealing systems |
Location | 7.1 Lab |
AMC | Required |
Local Dealer |
|
Actual Dealer |
|
SOP | |
Training & other policy documents | |
Recipies | |
Glimpse | |
Tool Facilities Requirements | |
Access | Controlled |
Lab Phone No | 119 |
Substrate allowed | |
Substrate Dimension | |
Chemical allowed | , |
Precursors/ Targets allowed *Based on stock availability | |
Precursor/ Target loaded inside tool | |
Target dimension | |
Gases allowed | |
Contamination remarks | |